Skip to content
AER IntelAerTwin Help

Tasks

Step-by-step procedures for every job in AerTwin, grouped in the order of an inspection — open, inspect, measure, record, review, report.

Each task is one procedure from start to finish. A task that needs the Inspector or Admin role says so under its title.

Open and navigate

  • Open a structureOpen a structure from the projects page and wait while AerTwin prepares its model.
  • Navigate the modelOrbit, pan, zoom and fly to a point on the 3D model with the mouse and the keyboard.
  • Keep your session activeAnswer "Are you still there?" so that AerTwin keeps your session, and open the structure again if the session was ended.
  • Leave a structure and sign outReturn to the projects page when you have finished with a structure, and sign out when you have finished for the day.

Inspect

Measure

  • Measure a distanceMeasure the length along the surface of the structure between two or more points — a joint, a crack, or the width of a defect.
  • Measure an areaMeasure the surface area inside an outline that you draw on the structure.
  • Measure missing concreteEstimate how much concrete has broken away from a face — a spall, a pop-out, a scour hole — with the 3D defect tool.
  • Measure a volumeMeasure the material between the surface and a base level that you choose — a deposit, a stockpile, scour or erosion.
  • Measure a depth profileMeasure how far the surface departs from the straight line between two points — a bulge, a recess, a step at a joint — and see it as a cross-section.
  • Change the shape of an outlineMove, add and remove the points of an outline or a line — before you save it, or on a saved finding with Apply.
  • Change what an outline measuresMeasure the same points as something else — an area as a volume or a 3D defect, a line as a depth profile or a section — without drawing them again.
  • Save a measurementKeep a measurement in the project's records, either at once under an automatic title or with a severity, a category and notes.

Record findings

  • Record a finding at a pointPlace a finding at one point on the structure and describe what you observed there.
  • Record a finding from a measurementTurn a measurement into a finding with a title, a location, an assessment, a severity and a recommended action.
  • Record a finding on a photographMark a defect on a source photograph — as a point, a rectangle or an outline — and record it as a finding on the model.
  • Edit a findingChange the title, the assessment, the severity or any other detail of a saved finding.
  • Undo and redo changesTake back a change you have just made — a deleted finding, an edit, a new outline, a filing — and redo it if you need to.
  • Delete a findingRemove a finding, or several ticked findings, from the project's active record — and bring one back with Undo.
  • Find findingsNarrow the Observations list to the findings you need, by search text and by filters, and go to one on the model.
  • Group findings by part of the structureFile several findings under one named part of the structure — "Pier 3, west face" — so that they are listed and reported together.
  • Update the view of a measurementReplace the view that a saved measurement flies back to — and that its PDF page is rendered from — with the view on the screen.
  • Mark the location of an instrumentPlace a mark on the structure where a monitoring instrument is installed — a piezometer, a crackmeter, a survey point — with its tag and type.

Review AI proposals

Sign off and report

  • Sign off a findingAccept a finding under your name so that it enters the project's reports.
  • Add a second reviewAdd an optional, independent second sign-off to a finding that another engineer has already signed off.
  • Export a PDF reportProduce a PDF report of signed-off findings — either the ones you have ticked, or all the ones the list shows — with each finding rendered from its saved view.
  • Export findings as CSVExport signed-off findings as a spreadsheet file, one row per finding, with every measured figure in its own column.
  • Copy a repair instructionCopy a signed-off finding's recommended action as plain text, ready to paste into a maintenance or work-order system such as SAP PM.

Work with your team

  • See what your team has doneRead what other members of your projects have saved recently — new, changed and deleted findings, and review decisions — and go to any of them.
  • Refresh the findings listBring your Observations list up to date with what your colleagues have saved since you opened the structure.
  • Resolve a conflicting editKeep your changes when a colleague saved the same finding while you were editing it.
AerTwin HelpQuestions: support@aer-intel.com